AAzkoro
Case studies

What the work looks like in practice

Six engagements, described by problem rather than by sector. Client names are withheld where confidentiality applies; sector and headcount are accurate.

Logistics · 22 staff

Cutting exception-handling time by a third

Challenge
Delivery exceptions were handled differently by each of the four people who covered the desk. Nobody could state how many occurred last quarter, so recurring causes were never addressed.
Approach
Two weeks of observation produced a five-category taxonomy covering eighty per cent of real events. We then built a one-page reporting template and a weekly triage review with named owners and an escalation threshold.
What made it stick
The template was cut from two pages to one after the first week because people stopped filling it in. The shorter version survived.
Result: resolution time down 31% in eight weeks, plus the first reliable monthly exception report — produced from data the team already had.
Distribution · 9 staff

Onboarding a new starter without a handover call

Challenge
Every new hire spent their first month shadowing the operations lead, who had no spare capacity to begin with. Hiring more people made the bottleneck worse, not better.
Approach
Documented the twelve recurring weekly tasks as short SOPs, each under two pages. A new starter then followed them with no assistance while we logged every point of confusion.
What made it stick
The SOP set was revised twice from the new starter's own notes. The second revision removed a step that had been performed for years without purpose.
Result: time-to-independent from 4 weeks to 9 days, and the operations lead recovered roughly a day a week.
Fulfilment · 14 staff

Making supplier terms visible before renewal

Challenge
Supplier terms lived in individual inboxes. Two renewals had auto-rolled at higher rates because the notice window was missed entirely.
Approach
Built a single register covering 46 suppliers: contract terms, notice windows, renewal dates and a named internal owner for each. Added a monthly review where the next 60 days of renewals are read out.
What made it stick
The register lives in a tool the team already opened daily rather than a new system nobody would visit.
Result: zero missed notice windows in the following twelve months, and two renegotiations that paid for the engagement several times over.
Wholesale · 31 staff

Finding the capacity nobody knew was missing

Challenge
The team was consistently behind, and the assumption was that headcount was too low. A hiring round was planned.
Approach
Two weeks of time sampling across the operations team showed 22% of hours going into re-keying data between two systems that could have been integrated, and a further 9% into status meetings that existed to compensate for that gap.
What made it stick
The integration was scoped and quoted before any hiring decision was made, which changed the order of investment.
Result: hiring deferred by two quarters, and roughly 1.3 FTE of capacity recovered without a single new hire.
Industrial services · 26 staff

Getting job records completed on site

Challenge
Engineers completed job sheets at the end of the week from memory. Warranty claims were routinely lost because the photographic evidence had never been captured at the time.
Approach
Redesigned the job sheet around four mandatory fields that could be completed on a phone in under ninety seconds, then piloted with two volunteers before rolling out.
What made it stick
The pilot engineers shaped the field list themselves. The final version had fewer fields than the original proposal, which is why it was used.
Result: warranty claim recovery up from 61% to 94% over two quarters, with no additional administration time.
Logistics · 18 staff

One peak plan instead of twelve remembered lessons

Challenge
Each November the same failures repeated: temporary staff untrained, carrier cutoffs missed, and a backlog that took three weeks to clear.
Approach
Ran a structured retrospective on the previous peak, converted the findings into a written plan with owners and dates, and set three checkpoint reviews through the peak period.
What made it stick
The plan was owned by the operations lead rather than by us, and the checkpoint reviews were already in the team calendar.
Result: peak backlog cleared in four days instead of three weeks, and the plan was reused the following year with two amendments.

Have a comparable problem?

Most of these started with a half-day diagnostic session and one agreed deliverable.

Start a conversation